10,000 BBL Tank Base

Project Info

Location: Sexsmith, Alberta
Completion Date: July 2014
Owner: Tourmaline

Description

Constructed a gravel tank base for a 10,000 bbl tank. Gravel was contained by an outer steel ring which was placed on native ground. Anchor bolts were welded to pre-installed piles on a pile cap. 

Categories

Oilfield