Client: | Tourmaline |
Completion Date: | July 2014 |
Constructed a gravel tank base for a 10,000 bbl tank. Gravel was contained by an outer steel ring which was placed on native ground. Anchor bolts were welded to pre-installed piles on a pile cap.
Have a look at our current openings, or fill out our online application.